Estructure assisted CPMC in gaining OSHPD approval for the installation of new and existing data equipment at the California West campus. Bracing and anchorage of server cabinets, equipment racks and cooling units on an existing raised floor were designed. Design solutions included supplemental floor stands, properly braced and anchored, to provide seismic restraint for the equipment.The project scope also included structural design of a platform for a new rooftop chiller.