Links

The Other 80 Percent: Strategies for Delegating Design of Nonstructural Systems

The Other 80 Percent: Strategies for Delegating Design of Nonstructural Systems

October 24, 2019

Nonstructural systems, such as cladding, partitions, utility distribution systems, specialty components, and contents, can comprise 80% or more of the cost of a new building. Poor seismic performance of these systems can result in loss of valuable components, costly repairs, extended downtime, blocked egress, and casualties. Even in moderate earthquakes, damage to nonstructural systems can […]